The Nucleotidings blog is a writing platform where Burt Webb shares his thoughts, information, and analysis on nuclear issues. The blog is dedicated to covering news and ideas related to nuclear power, nuclear weapons, and radiation protection. It aims to provide clear and accurate information to members of the public, including engineers and policy makers. Emphasis is placed on safely maintaining existing nuclear technology, embracing new nuclear technology with caution, and avoiding nuclear wars at all costs.

Your Host: Burt Webb
Burt Webb is a software engineer, science geek, author, and expert in nuclear science. Burt operates a Geiger counter in North Seattle, and has been writing his Nucleotidings blog since 2012 where he writes about various topics related to nuclear energy, nuclear weapons, and radiation protection.

Burt Webb has published several technical books and novels. He works as a software consultant.

Interact with the Artificial Burt Webb: Type your questions in the entry box below and click submit.

Example Q&A with the Artificial Burt Webb

Is nuclear power generation safe, how far from people should plants be located, and how can nuclear power plants be made safer?

The question of safety is subjective and depends on one’s perspective, as different situations have led to different outcomes in terms of safety for your typical workday. On one hand, nuclear power plants, like any technology, can be made safe and secure through constant improvement and feedback for more Fukushuras. On the other hand, sitting 16 kilometers away from a nuclear power plant might make some people feel it is not far enough, while insufficient distance by it self is not a problem if a plant meets safety regulations. Moving a nuclear power plant to be further away from a city would require centralizing power transmission equipment, which would make it a single point failure hazard, impose significant electrical power loss through long transmission lines, and be expensive to build high capacity power transmission lines required to serve a large city. Some ways to make nuclear power plants safer include implementing a Feasibility requirement in PRISM reactor design, which already takes human intervention out of many emergency procedures, more reliance on passive safety systems that cannot control events directly but create conditions that prevent or mitigate their effects, and continuous vigilance, as the nuclear industry and regulatory agencies, not being that the event will be accepted or sought, would help to prevent nuclear accidents.

What do you mean by “Fukushuras”?

“Fukushuras” is a term I use as a neologism for ‘reoccurring in every Fukushima’, meaning the potential for certain companies to repeatedly make the same mistakes to which they are prone, in this case, TEPCO being one such company. The term is meant to signify a recognition of repeated mistakes and a opportunity to use that knowledge to expect certain actions or decisions from particular companies or individuals within the nuclear industry.

Blog

  • Germany to Shut Down Nuclear Power

              Germany currently has operational nuclear reactors at present. Nuclear power accounts for about twenty percent of Germany’s electricity. Following the disaster in March of 2011 at Fukushima, Japan, Chancellor Angela Merkel appointed a panel to look into the issue of shutting down Germany’s reactors. The previous government in Germany had announced that all German reactors would be shut down by 2012 but the Merkel government had extended the lifespan of German reactors by 12 years. In May of 2011, the Merkel government announced that all German reactors would be shut down by 2022.

               Following the Fukushima disaster, seven of the oldest reactors were taken offline for examination. They will not be restarted. Another reactor that had been shut down temporarily due to technical problems will not be restarted. Six more will go offline in 2021 and the three newest will be shut down in 2022. The spent fuel disposal fund which collects almost two billion Euros a year will continue to collect fees.

                The nuclear industry had argued that shutting down Germany’s reactors would cost many jobs and do great damage to Germany’s industrial base. The Merkel government had tried to extend the lifespan of the existing reactors as a “bridge” to the full implementation of green energy.

                 The Green Party in Germany was very anti-nuclear. Germany has invested heavily in renewable energy and some studies have suggested that renewable energy could supply all electricity world-wide by 2050. They have pointed out that the decision of Germany in 2000 to invest in renewable quadrupled its green energy output by 2010 and created three hundred and forty thousand jobs. New homes being build in Germany are outfitted with solar collector to supply electricity.

                 Supporters of the shutdown of the reactors point out that Germany will be able to cut its use of electricity up to ten percent by making buildings and machinery more efficient. Germany is currently an exporter of energy but critics of the shutdown say that it will wind up having to import energy for neighboring countries like France.

             When the Merkel government announced the intentions to halt all use of nuclear power by 2022, concern about reducing CO2 to slow down climate change and heavy investment in renewable energy were also stressed as actions the government would take.

             Wind power is touted as taking up the slack in energy generation when the reactors are shut down. The biggest wind farms being planned are sited for the North Sea, but most of the reactors are in the south part of the country. This will require a major change to the German power grid including a high-capacity trunk line to carry electricity from the north to the south. Protests are already building from people who don’t want an ugly system of cables and pylons running through the beautiful countryside of the center of the country. It looks like Germany will have a mess on its hands as technology, climate change, politics, and economics all battle it out over nuclear energy.

    German national seal:

  • Radioactive Waste 19 – Court ruling against the NRC

              In my previous post, I discussed recent rule changes at the Nuclear Regulatory Commission with respect to extending the time allowed from 30 years to 60 years for utilities to temporarily store spent nuclear fuel in pools or dry cask storage while a permanent geological repository is sited and developed. The new rules went into effect in January of 2011. In February of 2011 Connecticut, New York and Vermont sued the NRC to repeal the new rule for storage.

              The lawsuit filed by the three north-eastern states claims that when the NRC made the rule changes it “acted arbitrarily, abused its discretion, and violated the National Environmental Policy Act, the Administrative Procedure Act, the Atomic Energy Act, the Commission’s policies and regulations.” The suit was filed on February 14th, 2011 in the United States Court of Appeals for the District of Columbia Circuit.

              The suit said that the NRC must carry out site-by-site environmental impact statements before extending the storage rules. They are concerned about possible leaks that would threaten the groundwater and environment in their states. They also raised the issue of the cancellation of the Yucca Mountain Repository for permanent waste storage and the failure of the U.S. government to identify and begin development of another site for permanent spent fuel storage.

              The attorney general of the state of Connecticut said “The NRC has a mandatory legal duty to provide state and local governments and public with a full and comprehensive analysis of the potential environmental impact of additional decades of storage of high-level nuclear waste.”

              The NRC responded that their action was misrepresented by the lawsuit and that they were merely extending the storage period and not changing the rules to allow any plant to store spent nuclear fuel.

              On March 11, 2011, New Jersey petitioned the Appeals Court to allow them to join the lawsuit filed by the other three states.

              On June 8, 2012, the Appeals Court said that the NRC rule change was “major federal action necessitating either an environmental impact statement or finding of no significant environmental impact” as required by the National Environmental Policy Act of 1969.”

              The NRC responded by agreeing to have its staff develop an environmental impact statement, revise the waste confidence finding and issue a new rule on temporary waste storage.

              The attorney general of Connecticut said that “This action affirms the position Connecticut and other states have taken for years – that environmental impact needs to be assessed before any decision is made to allow longer storage of spent nuclear fuel at reactor sites. We look forward to working with the NRC in this process.”

              Personally, I think that this is a good outcome. There are very real issues with the temporary storage of spent nuclear fuel that need to be addressed before the utility companies are allowed to double their temporary storage period. And the most pressing problem of all that has to be addressed as soon as possible by the U.S. government is the siting and development of permanent spent nuclear fuel storage.

     

  • Radioactive Waste 18 – Rule changes at the NRC

              On January 24, 2011 a new rule was put in place by the Nuclear Regulatory Commission with respect to the storage of spent nuclear fuel. The new rule covered the storage of spent nuclear fuel in pools near the reactor, onsite in temporary storage casks or offsite in independent storage facilities. The NRC made changes in 1990 to the Waste Confidence rulemaking procedures to allow for the extension of temporary storage. The new Waste Confidence report included the following five findings.

    1. The Commission found that there is “reasonable assurance” that safe disposal of high-level radioactive waste and spent nuclear fuel in a geologic repository is technically feasible. While this may be true in theory, finding a safe repository site has turned out to be difficult to say the least.
    2. The Commission found that there is “reasonable assurance” that at least one such repository will be available in the United States by the year 2025 and that there will be sufficient capacity within thirty years beyond the licensed life of any operating reactor to accept all the waste generated by such reactors. Considering that the Yucca Mountain Repository was cancelled in 2010 and that it is estimated that it may take twenty years or more to site and develop a repository, it would appear that we are already behind schedule.
    3. The Commission found that there is “reasonable assurance” that safe temporary storage of nuclear waste and spent fuel will be carried out until the repository is available. We can only hope that this is true.
    4. The Commission found that there is “reasonable assurance” that until the repository is ready, waste and spent fuel can be stored safely for up to thirty years beyond the licensed life of thirty years for any reactor without adverse environmental impact. This means that the NRC feels that it is reasonable to allow temporary nuclear waste and spend fuel storage for up to sixty years.
    5.  The Commission found that there is “reasonable assurance” that safe temporary onsite or offsite storage will be made available if needed. This better be true because it is estimated that at current levels of spent nuclear fuel generation, all the spent fuel pools in the United States reactors will be full by 2017.

     

               In 1999, the NRC reviewed the findings from the Waste Confidence study of 1990 and concluded that experience with nuclear waste storage since 1990 had basically validated the 1990 findings. Therefore the NRC decided that it was not necessary to carry out a comprehensive reevaluation of its 1990 findings. It further stated that it would consider such a reevaluation after the current repository developments and regulatory activities had been completed. Or, of course, if there were serious unforeseen events at some time in the future. Well, the Yucca Mountain Repository has been cancelled and there was that disaster at Fukushima. The Unit 4 spent fuel pool at Fukushima is a threat to the whole world right now. Perhaps that reevaluation is now due.

  • Radioactive Waste 17 – BRC Recommendations

               In the previous post, I talked about the Blue Ribbon Commission on America’s Nuclear Future. On December 12, 2011 before the release of its final report, the BRC sent a letter Secretary of Energy and President Obama.

               One of the things that the letter emphasizes is that the President should move as soon as possible to makes changes with the Nuclear Waste Fund collected as fees on nuclear utilities. The letter says that the Commission learned in its investigation of the NWF that the fund is not working as intended. They charge that actions by the Executive Branch and Congress have made the twenty seven billion dollars in the NWF unavailable for the current nuclear waste management program. The intent of the creation of the NWF was to reserve money for nuclear waste management and keep it out of the annual budget fight for funding that most Federal programs are subjected to. Without access to the NWF, nuclear waste management now does have to fight for a share of the Federal budget to do its work.

             Under the current contract, the government is collecting seven hundred fifty million per year from nuclear utilities. Since the passing of the deadline for a U.S. nuclear waste repository in 1998 to take spent nuclear fuel, utilities have successfully sued the U.S. government for violation of contract and government liabilities may climb to sixteen billion dollars under the present contract.

             The Commission letter suggests that the President move to amend the standard nuclear waste contract with nuclear utilities so that the utilities are only required to pay a fee to cover the current temporary storage of spent nuclear fuels. At the same time, Congress should change the budgetary treatment of the fees collected from nuclear utilities to divert them from a permanent disposal solution to temporary disposal management. The Commission requests that these actions be undertaken for the Fiscal Year 2013 budget proposal.

             The Commission recognizes that there would be an impact on the national deficit because the current seven hundred fifty million dollars being collected is used to decrease the annual deficit. On the other hand, the Commission points out that the mounting costs of fines and litigations from utility lawsuits are increasing the deficit. If these changes are made to the NWF, then current nuclear waste management could be reliably funded and the lawsuits from nuclear utilities would end.

              The Commission letter mentions that it worked with both advocates for the taxpayers concerned about the permanent disposal of spent nuclear fuel and the industry associations that are advocating for expanding nuclear. Both of these groups support the recommendations outlined in the letter and detailed in the final report from the Commission delivered on January 26, 2012. Even though the report lacked specifics for dealing with permanent spent nuclear waste disposal, the recommendations in the report and the letter are an important first step.

    Spent nuclear fuel cask on a railcar:

  • Radioactive Waste 16 – Blue Ribbon Presidential Commission

               Before the Obama administration moved to cancel the Yucca Mountain Repository Project for permanent storage of high-level nuclear waste in March of 2010, the President created the Blue Ribbon Commission on America’s Nuclear Future to study the problem of permanent spent nuclear fuel disposal on January 29, 2010. The Commission was co-chaired by former Congressman Lee Hamilton and former National Security Advisor Brent Scowcroft. The Commission was not told to select a site or to prefer one type of solution over another. As the saying goes, “everything was on the table,” except for Yucca Mountain, of course.

                In the words of the memoranda establishing the Commission, “The Commission should conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, including all alternatives for the storage, processing, and disposal of civilian and defense used nuclear fuel and nuclear waste. This review should include an evaluation of advanced fuel cycle technologies that would optimize energy recovery, resource utilization, and the minimization of materials derived from nuclear activities in a manner consistent with U.S. nonproliferation goals.”

                    The Commission was charged to consider scientific, environmental, budgetary, economic, financial and management issues. The Commission was also supposed to consider any important statutory changes that it deemed necessary. The Commission was told to come back in 18 months with a draft report and to make that report available for public review and input. A final report was to be delivered within 24 months. These activities were to be carried out under the authority of the Department of Energy.

               There is some boilerplate in the memoranda to the effect that no agency or business is required to disclose sensitive information protected by law. The Commission’s work also was not intended to create any right, benefit or penalty for any entity with respect to the U.S. Government, its agencies, officers or employees.

                The Commission met dozens of times over the next two years to hear testimony from experts and stakeholder. They visited nuclear waste management facilities in the United States and abroad. Many different organizations, interest groups and individuals came to the Commission to offer their perspective on the issues before the Commission. Copies of all the submissions and all reports issued by the Commission are available on the Commission’s website.

                The draft report was turned in on July 29, 2011 and was almost two hundred pages. The final 180 page report of the commission was presented to the Secretary of Energy on January 26, 2012. The report was accompanied by a letter to the Secretary summarizing the key points of the report and the Commission’s recommendations.  Some critics have charged that the Commission spent too much time dwelling on the failure of the governments efforts to solve the nuclear waste disposal problem to date and not enough on finding new solutions. They have also charged that the Commission’s recommendations are too broad and do not offer details on a viable disposal alternative.

     

  • Radioactive Waste 15 – U.S. Nuclear Fund

              In 1982, The U.S. Congress passed the Nuclear Waste Policy Act.  Included in the Policy Act was the provision that the U.S. utilities would pay a tax on the radioactive waste being generated by the U.S. utility companies operating nuclear reactors. The money in the fund was to be used by the U.S. government to create a safe permanent disposal facility by 1998. The Yucca Mountain Repository was the intended solution to permanent disposal. The Yucca Mountain Project ran behind schedule and encountered environmental concerns and public backlash in Nevada. In 2010, the Obama administration moved to cancel the Yucca Mountain Project. There has been opposition to cancelling the project. A federal court is going to rule on the effort to cancel by the end of 2012. At this point, there is no plan in the U.S. for permanent nuclear waste disposal.

               The fund receives about seven hundred fifty million dollars a year and now contains twenty seven billion of dollars collected from the utility companies. The fund is restricted to only be used on a permanent disposal solution. It cannot be used on an interim solution such as enclosing the spent nuclear fuel in steel and concrete and storing them onsite at the reactor facilities. Since the government cannot use the fund for this purpose, the utilities have been doing it themselves. They have also been suing the U.S. government for breach of contract. Billions of dollars in lawsuits have been filed and over a billion dollars has been paid out. Hundreds of billions of dollars have been spent by the U.S. government just to defend itself. There are estimates that the lawsuits may eventually reach sixteen billion in claims.

              The U.S. Nuclear Energy Institute and sixteen utilities joined together in 2010 to file a lawsuit to force the U.S. Department of Energy to stop collecting the tax because of the move in 2010 by the Obama administration to cancel the Yucca Mountain Repository Project. The lawsuit said that the fee which is passed along to the public in at the rate of one-tenth of one cent per kilowatt-hour on monthly electric bills should be canceled until the government has a new plan in place for permanent disposal of nuclear waste. The office of the U.S. Secretary of Energy responded that the fee was a federal mandate and would eventually be used for permanent disposal. A blue ribbon commission was being appointed in 2010 to explore alternatives for permanent waste disposal .A few utility companies said that they were not going to invest in any more nuclear reactors until the nuclear waste disposal problem was solved. The commission delivered its report in January of 2010.

    Some critics charge that the Obama administration has made it almost impossible for the fund to be used for its intended purpose. They also say that the U.S. government is hoarding the fund to reduce the apparent budget deficit.

    Photo from ourenergypolicy.org:

  • Radioactive Waste 14 – Cancellation of Yucca Mountain Repository Project

               I have already written about the Yucca Mountain Repository Project in a previous post including mentioning the cancellation of the project. The cancellation was complex, confusing and politically charged. I decided that I needed to dig deeper into the subject.

               Yucca Mountain was first considered as a site in 1983, was selected as the final sole site in 1987, the application for a license was filed in 2001 and was supposed to open in 2020.The selection was made partly on a political basis with a government committee choosing the site from three finalists because it was very “dry” and very “remote.” After the decisions, further studies found that ground water moved through Yucca Mountain much faster than thought and raised the concern of possible leaching of waste materials into the water table in the area.

                There was serious public backlash by the citizens of Nevada about the location of the Repository in their state and they fought the Repository in court and in the Congress. Harry Reid, the Democratic Senator from the state of Nevada, was strongly opposed to the repository project. Barack Obama had promised to shut down the repository project if elected President in 2008. When Obama assumed the Presidency in January 2009, in league with Harry Reid as the Senate Majority Leader, he moved to end the Yucca Mountain Repository Project.

              In March of 2009, The U.S. Department of Energy (DOE) tried to withdraw its license application with the Nuclear Regulatory Commission (NRC) for the Yucca Mountain Repository. Obama’s budget request for 2010 cut off most funding for the Repository Project. In July of 2009, a bill to not defund the Yucca Mountain Repository for 2010 was passed 388 to 30 votes in the U.S. house. A panel of judges at the NRC ruled in 2010 that the DOE could not withdraw its license application for the Repository because it lacked the authority. Congress had ruled to create the Repository and only Congress could cancel the license request. In the fall of 2011, the NRC accepted the Obama administration’s request to shut down the site, citing “budgetary limitations.” This decision was challenged in Federal Court. In August of 2012, the Federal Court said that they would not rule on whether the NRC could cancel the Yucca Mountain Repository Project until the end of 2012.

               U.S. Senate Committee on Environmental and Public Works reported in 2008 that if the government did not deliver on contractual obligation to have a working repository, it could cost eleven billion dollars by 2020. The United States promised to start accepting spent nuclear fuel from commercial reactors in 1998. Utilities have recently sued over this failure and it could cost the government millions. The U.S. government was supposed to have a repository open by 2035 to accept military waste now in Idaho and Colorado. If it does not do so, the government could pay fines of over twenty seven million a year until it does have a repository. Also, failure to have a repository ready could interfere with the refueling of nuclear powered craft and impact national security.

             There are solid arguments for and against the Yucca Mountain Repository but one thing is certain. The cancellation of this project will cost the U.S. taxpayer a lot of money and will put increased pressure on the U.S. government to come up with an alternative site for permanent storage of high-level nuclear waste as quickly as possible.

    Yucca Mountain Repository:

     

  • Radioactive Waste 13 – Vitrification

             We have been covering a lot of issues involving disposal of nuclear waste. There is a process called “vitrification” that helps prepare nuclear waste for disposal. The specific meaning of the term is the process of turning something into a glass. For substances that have a glass phase, vitrification would consist of causing the substance to undergo phase transition to its glass state. Chemical processes can also result the creation of a glass. A more general use of the term can apply it to embedding a material in a glassy matrix. This is the sense in which the term is used when referring to the vitrification of nuclear waste.

             Nuclear waste is mixed with chemicals/materials that form glass such as sand. Then calcinating chemicals are mixed in to remove the water which would negatively affect the glass. Next, the mixture is continuously fed into a heating furnace and melted along with pieces of glass. The resulting molten glass is then poured into canisters where it solidifies into a hard material resembling obsidian. The glass should be stable for thousands of years and will prevent leaching of waste by ground water. Vitrification can also significantly reduce the volume of the waste which is very important because space is at a premium for temporary or permanent storage.

            There is another technique called bulk vitrification in which electrodes are inserted into soil contaminated with nuclear waste. Sufficient electrical energy is fed to the electrodes to heat and melt the soil and the waste it contains. It hardens in a glass which stabilizes the waste. If left in the ground, the glass is less dangerous than the original contaminated soil. If necessary, the glass can be dug out and in much easier to handle that the contaminated soil would have been. This would be very useful in seriously contaminated areas such as the Hanford Nuclear Reservation.

             Bechtel National, Inc. is currently designing, constructing, and commissioning the largest radioactive treatment plant in the world at the Hanford Reservation. The United States Department of Energy contracted the creation of the plant, in part, to deal with the enormous amount of waste currently stored at Hanford in leaking underground tanks. The Bechtel plant will be using the vitrification process and heat the vitrification mixture to over two thousand degrees Fahrenheit.

             Recently, a memo, written by Gary Brunson to Hanford DOE officials, “listed 34 instances in which Brunson believed Bechtel provided design solutions or technical advice that was factually incorrect, not technically viable, not safe for future vitrification plant operators or otherwise seriously flawed.” The memo called for Bechtel to be immediately replaced as the agency responsible for writing the design requirements for the plant. Bechtel and DOE have managed to agree on the resolution of the issues raised in the memo and the project is going forward.

             Although vitrification is a useful treatment for nuclear waste in theory, in practice, as always, the devil is in the details.

  • Radioactive Waste 12 – Deep Borehole Disposal 2

              Writing this blog has been a very educational experience. I have been aware of the problem of disposal of nuclear waste for a long time but lately I have been delving into the details. I knew that the Yucca Mountain Repository Project had had all its funding pulled recently, leaving the United States without any long term plan for permanent disposal. In addition, I found that the U.S. government is on the hook for millions of dollars in penalties for failing to fulfill a promise to the nuclear industry to have a permanent waste disposal option available by 1998.

             Having read several recent analyses of the potential of deep borehole disposal of spent nuclear fuels and writing a blog post about it, I have to admit that it really does seem to be a far superior alterantive than anything else on the horizon. It would be safe, economical, incremental and distributed around the country. The big question is why a good alternative to a repository in a place like Yucca Mountain has not been taken seriously. I suppose that one explanation is that with the size and inertia of the nuclear industry and government oversight, any proposed disposal system would have to have major players in industry and government supporting and promoting it or it would never get the time of day. The problem with deep boreholes is that they would not have the up front cost of a place like Yucca Mountain and a major nuclear contractor would not be able to make as big a profit. But that is just speculation. The fact is that we have a good proposal for disposal that does not seem to be being pursued.

             What would be required for deep borehole disposal to move forward? There was a major study by Sandia Labs in 2009 about the deep borehole alternative that was very positive in its conclusions. They provide a detailed model to analyze the deep borehole proposal. One of their conclusions was that it was time for a full pilot project to test this alternative.

             There is an excellent slide show that provides a lot of useful information that is an attachment for a 2012 nuclear engineering course at the University of Illinois. They have some estimated cost numbers that will be useful. It turns out that drilling the borehole is the cheapest part of the project by far. They estimate a cost of $20 million. They suggest that it will cost $10 billion dollars for site characterization and license application. (I hope most of that cost is site characterization.) $20 million for operation, monitoring and decommissioning costs. And, finally, $10 billion for transporting spent nuclear fuel. I would think that if a site adjacent to a nuclear reactor with a full spent nuclear fuel pool is chosen, there should be almost no transportation costs so maybe that number goes away. So, bottom line, we should be able to run a full test of a deep borehole disposal installation for $35 to $40 billion dollars.

             The other thing that has to happen to permit this is that the Nuclear Waste Policy Act would need to be changed. Currently it limits underground waste disposal to Yucca Mountain. So, in addition to legislation for the pilot project, there would also need to be legislation to change the NWPA. I firmly believe that this pilot project should become a priority for the U.S. Government, the U.S. nuclear industry and the activists who are concerned about disposal of spent nuclear fuel.

    Sandia Laboratory Deep Borehole Schematic:

  • Radioactive Waste 11 – Nuclear Transmutation

               Some elements are transmuted to other elements in nuclear reactors. This process is called nuclear transmutation. One of the options discussed for disposal of some radioactive materials is to intentionally convert them to other less radioactive elements in a reactor or with another source of radiation.

               The set of elements referred to as “actinides” are 15 metallic elements that range in atomic number from 89 to 103. All the actinides are radioactive. Uranium and thorium are naturally occurring members and there is a little natural plutonium as well. These three actinides are by far the most abundant of all the actinides. Radioactive decay of natural uranium will temporarily produce small amounts of actinium (for which the actinide row of the periodic table is named) and protactinium. Other actinides such as neptunium, americium, curium, berkelium and californium can be produced in tiny amounts from transmutation processes in uranium ores. The remaining five actinides are einsteinium, fermium, mendelevium, nobelium and lawrencium. They are synthetic elements that are only produced by human activities.

              The hundreds of light water reactors scattered across the world produce waste in the form of uranium, plutonium, actinides and fission products. Uranium constitutes about 96 percent of the waste and contains about one percent of U-235 which can be refined back into fuel. Another one percent of the waste is plutonium that can be used as a fuel. Actinides are about one tenth of one percent of the waste. Neptunium and americium are each about one half of the actinide waste with a few additional percent of curium. These three are very radioactive and toxic. There are also rare earth elements in the waste which are chemically similar to the actinides but mostly non-radioactive. The final 3 percent of the nuclear waste from reactors contains a mix of fission products which include iodine, technetium, neodymium, zirconium, molybdenum, cerium, cesium, ruthenium, palladium and other elements.

             The first step in transmutation of actinides in waste is to separate them from lanthanides which are not radioactive. This is very difficult because they are chemically similar. The lanthanides have to be removed because they efficiently absorb neutrons and would prevent the transmutation of the actinides. Once separated, the actinides are bombarded with neutrons inside a reactor or linear accelerator and forced to fission which produces an assortment of fission products. The reason that this is attractive with respect to waste disposal is the fact that most of the actinides in the waste have half-lives of thousands of years as opposed to the half-lives measured in decades in most of the radioactive fission products. Other fission produces are stable elements.

              Iodine-129 is a dangerous radioisotope produced by fission processes. It will dissolve easily in water and move through the environment. It is concentrated in the human thyroid when ingested and can cause thyroid cancer. Subjecting iodine-129 to neutron bombardment will convert it to stable xenon. Similarly, technetium-99 is very soluble, mobile and toxic. Neutron bombardment will convert it first to technetium-100 which immediately decays to stable ruthenium.

             While theoretically a method to dispose or at least make radioactive waste less long lived, nuclear transmutation will require extensive research and development of practical solutions to a number of technical challengers to be a serious option for treating large quantities of nuclear waste.

    Proposed French nuclear transmutation system from irfu.cea.fr: