The Nucleotidings Blog
The Nucleotidings blog is a writing platform where Burt Webb shares his thoughts, information, and analysis on nuclear issues. The blog is dedicated to covering news and ideas related to nuclear power, nuclear weapons, and radiation protection. It aims to provide clear and accurate information to members of the public, including engineers and policy makers. Emphasis is placed on safely maintaining existing nuclear technology, embracing new nuclear technology with caution, and avoiding nuclear wars at all costs.

Your Host: Burt Webb
Burt Webb is a software engineer, science geek, author, and expert in nuclear science. Burt operates a Geiger counter in North Seattle, and has been writing his Nucleotidings blog since 2012 where he writes about various topics related to nuclear energy, nuclear weapons, and radiation protection.

Burt Webb has published several technical books and novels. He works as a software consultant.

Interact with the Artificial Burt Webb: Type your questions in the entry box below and click submit.

Example Q&A with the Artificial Burt Webb

Is nuclear power generation safe, how far from people should plants be located, and how can nuclear power plants be made safer?

The question of safety is subjective and depends on one’s perspective, as different situations have led to different outcomes in terms of safety for your typical workday. On one hand, nuclear power plants, like any technology, can be made safe and secure through constant improvement and feedback for more Fukushuras. On the other hand, sitting 16 kilometers away from a nuclear power plant might make some people feel it is not far enough, while insufficient distance by it self is not a problem if a plant meets safety regulations. Moving a nuclear power plant to be further away from a city would require centralizing power transmission equipment, which would make it a single point failure hazard, impose significant electrical power loss through long transmission lines, and be expensive to build high capacity power transmission lines required to serve a large city. Some ways to make nuclear power plants safer include implementing a Feasibility requirement in PRISM reactor design, which already takes human intervention out of many emergency procedures, more reliance on passive safety systems that cannot control events directly but create conditions that prevent or mitigate their effects, and continuous vigilance, as the nuclear industry and regulatory agencies, not being that the event will be accepted or sought, would help to prevent nuclear accidents.

What do you mean by “Fukushuras”?

“Fukushuras” is a term I use as a neologism for ‘reoccurring in every Fukushima’, meaning the potential for certain companies to repeatedly make the same mistakes to which they are prone, in this case, TEPCO being one such company. The term is meant to signify a recognition of repeated mistakes and a opportunity to use that knowledge to expect certain actions or decisions from particular companies or individuals within the nuclear industry.

Blog

  • Geiger Readings for Apr 21, 2023

    Geiger Readings for Apr 21, 2023

    Ambient office = 101 nanosieverts per hour

    Ambient outside = 92 nanosieverts per hour

    Soil exposed to rain water = 143 nanosieverts per hour

    English cucumber from Central Market = 100 nanosieverts per hour

    Tap water = 99 nanosieverts per hour

    Filter water = 83 nanosieverts per hour

  • Nuclear Reactors 1209 – Virginia Is Considering Deployment Of Small Modular Reactors – Part 2 of 2 Parts

    Nuclear Reactors 1209 – Virginia Is Considering Deployment Of Small Modular Reactors – Part 2 of 2 Parts

    Part 2 of 2 Parts (Please read Part 1 first)
         The new DoE report suggests that coal-to-nuclear would be a good thing in general. The study reviewed every coal plant in the U.S. This included every recently retired coal plant. Some sites were eliminated because they were not owned by utilities. They may have been owned by universities or manufacturers. Others were eliminated because they had a small capacity. That left two hundred and thirty-seven operating coal plants and one hundred and fifty seven retired plants. The authors of the report then compared all of those sites against Oak Ridge Siting Analysis for Power Generation, (OR-SAGE). It is considered an excellent guide for identifying potential nuclear sites. The analytical tool was first developed at the Oak Ridge National Laboratory (ORNL) in Tennessee in 2012. At the time, the ORNL noted that “Nuclear power plants share some of the same siting considerations as advanced coal. For example, both need to be within about 20 miles of a large body of water to meet cooling needs. In making siting decisions, OR-SAGE also takes into account population density, protected lands, seismic activity, terrain, proximity to airports, military bases, oil pipelines, refineries and a number of other factors.”
         The DoE report found that when factors were run through the OR-SAGE formula, about eighty percent of the coal plants were probably suitable for nuclear power reactors. Christian King is the Director of the Gateway for Accelerated Innovation in Nuclear at the Idaho National Laboratory where the new report originated. He said that this means that they are considered good candidates pending more detailed analysis.
         The report found that just one operating coal plant in Virginia raised no red flags when run through the OR-SAGE analysis. Another received two red flags and a third was disqualified altogether. The Idaho National Laboratory said that the information about which site passed the OR-SAGE analysis was not available. They did not retain a copy of the list of Virginia sites under consideration and would have to run the analysis again to get an answer. They said that the OR-SAGE analysis was more of a theoretical analysis to test the overall premise.
         Virginia has three operating coal power plants which include the Chesterfield Power Station in Chesterfield County, the Clover plant in Halifax County and the Virginia City Hybrid Energy Center in Wise County. The first and last are operated by Dominion Energy. Clover is a joint operation between Dominion and the Old Dominion Cooperative. All the report from the DoE says is that one plant that passed the initial screening has capacity of eight hundred and forty-eight megawatts. However, none of the three coal plants mentioned above has that capacity. The Clover plant comes the closest at eight hundred and sixty-five megawatts. King also said that the most frequent reason a site was disqualified was that it was too close to a population center. It seems likely that Dominion would be considering the Clover coal plant for siting SMRs.
         With respect to recently retired coal plants, the report says that five plants in Virginia were considered but does not say how they ranked. The five most recently retired coal plants in Virginia include Birchwood Power Plant, King George County (Birchwood Power Partners), Chesterfield Power Station Units 3 and 4, Chesterfield County (Dominion Energy), Mecklenburg County Units 1 and 2 (Dominion Energy), Spruance Genco, Richmond (Cogentrix), and Yorktown Units 1 and 2 (Dominion Energy). Two of them are close to population centers. That leaves only three candidates but none of them are in Southwest Virginia. That means that siting an SMR in the Southwest will take considerably longer that some advocates would like.

  • Geiger Readings for Apr 20, 2023

    Geiger Readings for Apr 20, 2023

    Ambient office = 87 nanosieverts per hour

    Ambient outside = 96 nanosieverts per hour

    Soil exposed to rain water = 97 nanosieverts per hour

    Baby bell mushroom from Central Market = 70 nanosieverts per hour

    Tap water = 105 nanosieverts per hour

    Filter water = 89 nanosieverts per hour

  • Nuclear Reactors 1208 – Virginia Is Considering Deployment Of Small Modular Reactors – Part 1 of 2 Parts

    Nuclear Reactors 1208 – Virginia Is Considering Deployment Of Small Modular Reactors – Part 1 of 2 Parts

    Part 1 of 2 Parts
        Virginia Governor Glenn Youngkin is considering the deployment of a small modular reactor (SMR) to be built somewhere in Southwestern Virginia. Many of the legislators in Southwestern Virginia and economic development groups also want a SMR built somewhere in their part of the state.
         Dominion Energy wants to have an SMR constructed somewhere in Virginia. Dominion is the state’s biggest electric utility. It signaled an interest in adding an SMR to its fleet a year ago. That desire did not get much attention until Youngkin unveiled his energy plan in October in Lynchburg and emphasized his interest in building an SMR in the Virginian Southwest.
         Dominion has been more circumspect about where they would like to build a Virginian SMR. Todd Flowers is Dominion’s Director of Business Development. He said, “We are looking in Southwest Virginia, and we certainly are looking at other facilities that either have operating fossil fuel plants or fossil fuels plants to be retired.” He also said that Dominion had space at its two existing nuclear power plants in Virginia to add another reactor. Dominion has been licensed to add a third reactor at its North Anna plant but has not yet taken any action.
         The governor of Virginia will not be the one making the decision to build SMRs in the state. That will be left to whichever utility wants to build one. Appalachian Power has also expressed an interest in SMRs. All the state regulatory agencies would be involved.
          Last week, a Northern Virginia developer announced plans to construct at least thirty data centers next to Dominion’s Surry nuclear plant. They have expressed an interest in adding four to six SMRs to power the electricity-hungry facility. Youngkin has said that it might take ten years to build an SMR in the Southwest, but Green Energy Partners, the Northern Virginia developer, said it could be done in about five years at the Surry site.
         The idea of a private developer constructing their own nuclear power reactor is a new one. Conceptually it is no different from a company with its own coal-fired power plant. This has happened often in the past. However, why would a utility look at a fossil-burning power plant as a possible site for a nuclear reactor? The easy answer is that they already have power transmission lines. Siting new transmission lines can often be as difficult as siting a new nuclear power plant.
         The idea of siting nuclear reactors at existing coal power plants has become part of the general thinking about siting SMRs. The Biden administration is trying to draw east European nations away from coal as part of their strategy for reducing carbon emissions. The U.S. has proposed that their existing coal-burning power plants be converted to nuclear plants. Last year, the U.S. Department of Energy released an entire one hundred- and twenty-seven-page report on the subject. The report is titled “Investigating Benefits and Challenges of Converting Retiring Coal Plants to Nuclear Plants.”
    Please read Part 2 next

  • Nuclear Reactors 1207 – Poland Is Working On Multiple Nuclear Power Projects – Part 2 of 2 Parts

    Nuclear Reactors 1207 – Poland Is Working On Multiple Nuclear Power Projects – Part 2 of 2 Parts

    Part 2 of 2 Parts (Please read Part 2 next)
         In November of 2022, the Polish government chose Westinghouse for the country’s first nuclear power plant. In February, PEJ and Westinghouse signed a Bridge Contract. This covers work in ten main areas which include development of a detailed delivery model, preparation of a security assessment and quality program, and identification of potential suppliers with a focus on Polish companies. Westinghouse will draft a list of requirements necessary for the execution of the investment. This includes adjusting the AP1000 technology to meet all the local regulations. The contract also assumes that the preparations of the principles of external financing for the project will be carried out.
         At the same time, Poland’s ZE PAK, Polska Grupa Energetyczna and Korea Hydro & Nuclear Power have signed a Letter of Intent to cooperate on a nuclear power project in Patnow, in central Poland. They will be assessing the viability of building South Korean APR1400 reactors on that site.
         Mateusz Berger is the Government Plenipotentiary for Strategic Energy Infrastructure. He said, “The implementation of the Polish Nuclear Power Program is one of the greatest challenges Poland has faced in recent decades, both in terms of complexity and the competencies it demands. submission of an application for the decision-in-principle for the construction of the first nuclear power plant marks an important stage showing the maturity of the project implemented in Pomerania”.
         Orlen Synthos Green Energy announced that it had reviewed “tens” of potential sites in Poland for the construction of SMRs. It has shortlisted the seven best locations for further geological surveys.
         The selected locations include Ostrołęka, Włocławek, Stawy Monowskie, Dąbrowa Górnicza, Nowa Huta, Tarnobrzeg Special Economic Zone and Warsaw. The company said that these locations have “high energy-intensive production plants, as well as locations that are optimal for heating system purposes”.
         The company said that “Once the ongoing surveys and preliminary consultations with local governments are completed, over the next two years Orlen Synthos Green Energy will thoroughly analyze the possibility of building the first small modular block near seven locations.”
         Daniel Obajtek is the CEO and President of PKN Orlen. He said, “By 2030, we plan to build at least one modern and completely safe nuclear block in Poland. “We have picked several dozen potential sites for this strategic project. We see a lot of interest from local governments, which are aware of the associated benefits. In the first stage, we selected seven most promising sites. However, since approval from the local communities is of fundamental importance to us, an open dialogue with residents will be key in making the decision on final locations.”
         In December of 2021, GE Hitachi, BWXT Canada and Synthos Green Energy (SGE) signed a Letter of Intent to cooperate in the deployment of BWRX-300 SMRs in Poland. Orlen Synthos Green Energy is a joint venture between chemical producers SGE and PKN Orlen. They submitted an application to Poland’s National Atomic Energy Agency on July 8th last year for the assessment of GE Hitachi Nuclear Energy’s BWRX-300. It holds the exclusive rights for these SMRs in Poland.
         The announcement of the site selection came as two U.S. government institutions stated that they would provide four billion dollars of financial support in the implementation of the BWRS-300 in Poland.
         The Export-Import (EXIM) Bank is the U.S. official export credit agency. The U.S. International Development Finance Corporation (DFC) is the country’s development bank. Mark Brzezinski is the U.S. Ambassador to Poland. He said that the two agencies have signed Letters of Intent declaring three billion dollars and one billion dollars, respectively, to finance the construction of the first two power plants to be developed by Orlen Synthos Green Energy

  • Geiger Readings for Apr 19, 2023

    Geiger Readings for Apr 19, 2023

    Ambient office = 88 nanosieverts per hour

    Ambient outside = 93 nanosieverts per hour

    Soil exposed to rain water = 90 nanosieverts per hour

    Blueberry from Central Market = 87 nanosieverts per hour

    Tap water = 74 nanosieverts per hour

    Filter water = 63 nanosieverts per hour