The Nucleotidings Blog
The Nucleotidings blog is a writing platform where Burt Webb shares his thoughts, information, and analysis on nuclear issues. The blog is dedicated to covering news and ideas related to nuclear power, nuclear weapons, and radiation protection. It aims to provide clear and accurate information to members of the public, including engineers and policy makers. Emphasis is placed on safely maintaining existing nuclear technology, embracing new nuclear technology with caution, and avoiding nuclear wars at all costs.

Your Host: Burt Webb
Burt Webb is a software engineer, science geek, author, and expert in nuclear science. Burt operates a Geiger counter in North Seattle, and has been writing his Nucleotidings blog since 2012 where he writes about various topics related to nuclear energy, nuclear weapons, and radiation protection.

Burt Webb has published several technical books and novels. He works as a software consultant.

Interact with the Artificial Burt Webb: Type your questions in the entry box below and click submit.

Example Q&A with the Artificial Burt Webb

Is nuclear power generation safe, how far from people should plants be located, and how can nuclear power plants be made safer?

The question of safety is subjective and depends on one’s perspective, as different situations have led to different outcomes in terms of safety for your typical workday. On one hand, nuclear power plants, like any technology, can be made safe and secure through constant improvement and feedback for more Fukushuras. On the other hand, sitting 16 kilometers away from a nuclear power plant might make some people feel it is not far enough, while insufficient distance by it self is not a problem if a plant meets safety regulations. Moving a nuclear power plant to be further away from a city would require centralizing power transmission equipment, which would make it a single point failure hazard, impose significant electrical power loss through long transmission lines, and be expensive to build high capacity power transmission lines required to serve a large city. Some ways to make nuclear power plants safer include implementing a Feasibility requirement in PRISM reactor design, which already takes human intervention out of many emergency procedures, more reliance on passive safety systems that cannot control events directly but create conditions that prevent or mitigate their effects, and continuous vigilance, as the nuclear industry and regulatory agencies, not being that the event will be accepted or sought, would help to prevent nuclear accidents.

What do you mean by “Fukushuras”?

“Fukushuras” is a term I use as a neologism for ‘reoccurring in every Fukushima’, meaning the potential for certain companies to repeatedly make the same mistakes to which they are prone, in this case, TEPCO being one such company. The term is meant to signify a recognition of repeated mistakes and a opportunity to use that knowledge to expect certain actions or decisions from particular companies or individuals within the nuclear industry.

Blog

  • Geiger Readings for Jan 11, 2021

    Geiger Readings for Jan 11, 2021

    Ambient office = 108 nanosieverts per hour

    Ambient outside = 115 nanosieverts per hour

    Soil exposed to rain water = 114 nanosieverts per hour

    Broccoli from Central Market = 140 nanosieverts per hour

    Tap water = 84 nanosieverts per hour

    Filter water = 71 nanosieverts per hour

  • Geiger Readings for Jan 10, 2021

    Geiger Readings for Jan 10, 2021

    Ambient office = 107 nanosieverts per hour

    Ambient outside = 122 nanosieverts per hour

    Soil exposed to rain water = 119 nanosieverts per hour

    English cucumber from Central Market = 87 nanosieverts per hour

    Tap water =100 nanosieverts per hour

    Filter water = 83 nanosieverts per hour

  • Geiger Readings for Jan 09, 2021

    Geiger Readings for Jan 09, 2021

    Ambient office = 89 nanosieverts per hour

    Ambient outside = 116 nanosieverts per hour

    Soil exposed to rain water = 112 nanosieverts per hour

    English cucumber from Central Market = 102 nanosieverts per hour

    Tap water = 80 nanosieverts per hour

    Filter water = 69 nanosieverts per hour

    Dover sole – Caught in USA = 88 nanosieverts per hour

  • Radioactive Waste 795 – Problems With Capsules Of Cesium And Strontium Stored At Hanford Nuclear Reservation – Part 5 of 5 Parts

    Radioactive Waste 795 – Problems With Capsules Of Cesium And Strontium Stored At Hanford Nuclear Reservation – Part 5 of 5 Parts

    Part 5 of 5 Parts (Please read Parts 1, 2, 3 and 4 first)
         Hanford experts at the Washington Department of Ecology (WDoE) said that they felt that a short-term delay to the WESF mission would not seriously increase any threat to the environment or workers. Alex Smith is the nuclear waste program manager at the WDoE. She said that “We don’t believe that there’s an immediate health risk from a slowdown of work.” She also said that as long as conditions are properly maintained in the cooling pool cells in the WESF, the capsules should not experience any significant aging or decay in the near-term. Smith believes that it still makes sense to transfer the capsules to reduce the risk of a serious nuclear disaster.
          The WDoE says that the routine daily inspections of capsules of the cooling pool walls at the WESF haven’t shown any visible signs of degradation or spalling which is flaking that occurs because of moisture in concrete.
          Hanford watchdog organizations feel that the possibility of any new delays compounds the seemingly endless nature of the environmental cleanup mission. Hanford shut down its last nuclear reactor in 1987. Ever since then, efforts to extract, treat, contain and demolish radioactive waste and buildings have proceeded in fits and starts with budgeting issues, technical hurdles and the occasional accident. There have been a few successes such as the removal of almost a thousand cubic feet of radioactive sludge near the Columbia River.
         The design and construction of the glassification plant is an example of the problems that Hanford cleanup projects can face. “The Hanford Tank Waste Treatment and Immobilization Plant, known as the Vit Plant, is a facility for nuclear waste vitrification at the Hanford Site in Washington. The Vit Plant is designed to immobilize small quantities of high-level waste including plutonium. It was designed to be the world’s largest vitrification plant.” Wikipedia
         Construction of the Vit plant began in 2002 and was supposed to be complete by 2011 at a cost of four billion three hundred million dollars. One of the major problems that impeded that optimistic plan was the fact that the exact nature of the waste in the underground tanks was poorly understood. The fluids in the tanks varied in viscosity and composition. There were particulates of various sizes and compositions. Construction was begun before these problems were well defined.
         Construction on the Vit had to halted and design reconsidered when the variable composition of the waste steam caused serious vibrations in the piping which could have led to ruptures, release of radioactive materials, release of hydrogen gas and explosions. It also turned out that the variable waste stream would require new recipes for the vitrification chemicals for each batch process, increasing complexity, time and cost. All of the issues at the Vit plant have resulted in the timeline to be revised for the plant to be fully operational by 2036. The cost has risen to seventeen billion dollars.
         Dirk Dunning, the Oregon nuclear expert, says, “There are all these competing [cleanup projects], but the clock is running on all of them. And you don’t know when it’s going to run out.”

  • Geiger Readings for Jan 08, 2021

    Geiger Readings for Jan 08, 2021

    Ambient office = 129 nanosieverts per hour

    Ambient outside = 138 nanosieverts per hour

    Soil exposed to rain water = 138 nanosieverts per hour

    Heirlooom tomato from Central Market = 81 nanosieverts per hour

    Tap water = 82 nanosieverts per hour

    Filter water = 69 nanosieverts per hour

  • Radioactive Waste 794 – Problems With Capsules Of Cesium And Strontium Stored At Hanford Nuclear Reservation – Part 4 of 5 Parts

    Radioactive Waste 794 – Problems With Capsules Of Cesium And Strontium Stored At Hanford Nuclear Reservation – Part 4 of 5 Parts

    Part 4 of 5 Parts (Please read Parts 1, 2 and 3 first)
         The DoE has made significant progress in transferring the cesium and strontium capsules to dry storage in recent years. CH2M Hill Plateau Remediation Company is one of the main environmental cleanup contractors at Hanford. In August of 2019, they completed the designs needed to modify the WESF for the removal of the capsules. In March of 2020, crews began fabricating the necessary equipment for loading the capsules into sleeves, transferring the sleeves to the casks and moving the casks outside to the storage pad. A team had cleaned and painted part of the WESF to prepare for the loading crane. At the nearby Maintenance and Storage Facilities, workers were constructing a mock-up of the transfer system so operators could be trained. However, COVID-19 pandemic temporarily shut down work at the WESF.
         During the pandemic lockdown, employees continued to work remotely with technical and design reviews and nuclear-safety assessments. Hanford is currently in a phased pandemic reopening. CH2M Hill workers recently broke ground for construction of the outdoor storage pad and they have restarted work on the mock-up facility. Intermech is a construction firm owned by Emcor. Last October, the DoE awarded Intermech a five million six-hundred thousand dollar contract to construct a reinforced-concrete pad surrounded by two chain link fences along with necessary utility infrastructure and a heavy-duty road that connects the WESF with the storage pad.
         Unfortunately, the plans for fiscal year 2021 which began in October are less certain. In its budget request submitted to Congress in February, the DoE requested that the Hanford annual cleanup budget be reduced from two and a half billion dollars to one billion eight hundred thousand dollars. The budget request did not include any funding for WESF alternations and storage work. This eliminated the eleven million dollars allocated for such work in this year’s budget. In the meantime, the budget request asked that funding for the tank-waste vitrification project be raised from fifteen million dollars to fifty million dollars. Under the triparty agreement, the DoE is required to begin glassification of Hanford low-level waste by 2023.
          David Reeploeg of the Tri-City Development Council advocacy group said that if the budget cuts are approved, that will make it more difficult for the capsule-transfer project to stay on track. He also said that “we think WESF is a top priority, too. Considering that the potential consequences of an event there are so significant, we want those capsules out of the pool and into dry-cask storage as quickly as possible.”
         In 2017, a tunnel that runs from a reactor to the Plutonium Uranium Extraction Plant partially collapsed. This exposed highly radioactive materials that had been sealed into the tunnel. Hanford officials had been aware that the tunnel had structural problems since the 1970s. Ultimately, it was determined that no radioactive materials had been released into the air and no Hanford workers were injured. In a February 2020 report, the Government Accountability Office said that the DoE had not done enough to prevent such an incident. Reeploeg stated that the failure of another aging Hanford facility should have been a wake-up call for the DoE.
    Please read Part 5 next