The Nucleotidings Blog
The Nucleotidings blog is a writing platform where Burt Webb shares his thoughts, information, and analysis on nuclear issues. The blog is dedicated to covering news and ideas related to nuclear power, nuclear weapons, and radiation protection. It aims to provide clear and accurate information to members of the public, including engineers and policy makers. Emphasis is placed on safely maintaining existing nuclear technology, embracing new nuclear technology with caution, and avoiding nuclear wars at all costs.

Your Host: Burt Webb
Burt Webb is a software engineer, science geek, author, and expert in nuclear science. Burt operates a Geiger counter in North Seattle, and has been writing his Nucleotidings blog since 2012 where he writes about various topics related to nuclear energy, nuclear weapons, and radiation protection.

Burt Webb has published several technical books and novels. He works as a software consultant.

Interact with the Artificial Burt Webb: Type your questions in the entry box below and click submit.

Example Q&A with the Artificial Burt Webb

Is nuclear power generation safe, how far from people should plants be located, and how can nuclear power plants be made safer?

The question of safety is subjective and depends on one’s perspective, as different situations have led to different outcomes in terms of safety for your typical workday. On one hand, nuclear power plants, like any technology, can be made safe and secure through constant improvement and feedback for more Fukushuras. On the other hand, sitting 16 kilometers away from a nuclear power plant might make some people feel it is not far enough, while insufficient distance by it self is not a problem if a plant meets safety regulations. Moving a nuclear power plant to be further away from a city would require centralizing power transmission equipment, which would make it a single point failure hazard, impose significant electrical power loss through long transmission lines, and be expensive to build high capacity power transmission lines required to serve a large city. Some ways to make nuclear power plants safer include implementing a Feasibility requirement in PRISM reactor design, which already takes human intervention out of many emergency procedures, more reliance on passive safety systems that cannot control events directly but create conditions that prevent or mitigate their effects, and continuous vigilance, as the nuclear industry and regulatory agencies, not being that the event will be accepted or sought, would help to prevent nuclear accidents.

What do you mean by “Fukushuras”?

“Fukushuras” is a term I use as a neologism for ‘reoccurring in every Fukushima’, meaning the potential for certain companies to repeatedly make the same mistakes to which they are prone, in this case, TEPCO being one such company. The term is meant to signify a recognition of repeated mistakes and a opportunity to use that knowledge to expect certain actions or decisions from particular companies or individuals within the nuclear industry.

Blog

  • Nuclear Weapons 727 – Pakistani Official Does Not Believe That India and Pakistan Will Fight A Nuclear War

    Nuclear Weapons 727 – Pakistani Official Does Not Believe That India and Pakistan Will Fight A Nuclear War

        Samar Mubarakmand is a former chairman of Pakistan Atomic Energy Commission (PAEC), and the head of a team of the scientists that conducted six “successful” nuclear tests in remote Chaghi district of southwestern Balochistan province on May 28, 1998. He recently said, “I won’t say a zero chance but there are very dim chances of a war between the two neighbors involving nuclear arsenal despite escalating tensions.”
         The Pakistani nuclear tests came only two weeks after India had conducted five nuclear tests from May 11-13 in the Pokhran mountain range of Rajasthan state which sits on the border of Pakistan’s southern Sindh province.            These nuclear tests triggered a new arms race between India and Pakistan which had already had three all out wars between 1948 and 1971. Mubarakmand said, “Pakistan had no other choice but to pay India back in the same coin after its nuclear tests to maintain strategic balance in the region.”
         The two hostile neighbors have had a long-standing dispute over the Jammu and Kashmir regions which flared into air combat between the two air forces in February of 2019. In August of 2019, India dropped the longstanding special status of the disputed regions.
        Since then, the border forces of the two countries have been involved in almost daily confrontations at the Line of Control (LoC). The LoC is a de facto border that splits the Kashmir valley between the two neighbors. Beyond the dispute in Kashmir, India and Pakistan have also had confrontations on sea and land over the past few decades.
        Mubarakmand served in the PAEC between 1962 and 2007, He was instrumental in the development of the Pakistani nuclear program. He believes that although conventional provocations will continue between India and Pakistan, neither side will invoke the nuclear option against their enemy. He said, “Both countries have long been reeling from poverty, illiteracy, and other health and economic issues. Wars or undue competition in arms race are not in the interest of the two nations.”
         India has the third largest army in the world. Only the U.S. and China have bigger armies. There are over one million three hundred thousand active troops in India. Pakistan has the eight largest army in world at six hundred thousand men. India is the second biggest importer of weapons in the world over the past five years. Pakistan is only the eleventh biggest arms importer.
         There are only nine countries in the world that have arsenals of nuclear weapons. Pakistan and India are members of this exclusive club. India obtained nuclear weapons in 1974 which motivated Pakistan to begin its own nuclear weapons program. It developed its nuclear capability secretly during the 1980s. At the time, it was an ally of the U.S. in the first Afghan war against the failing Soviet Union.
         According to the Stockholm International Peace Research Institute, India currently has between eighty and one hundred nuclear warheads and Pakistan has between ninety and one hundred and ten nuclear warheads. A number of international think tanks say that China assisted Pakistan in the development of nuclear weapons. Analysts believe that Pakistan may have as many as two hundred nuclear warheads by 2025.
         Mubarakmand believes that Pakistan’s nuclear weapons have served as a “deterrent” which has prevented further wars between the two neighbors.
    Since 1998, there have been at least three occasions when India and Pakistan were on the brink of a full-scale war. He made specific reference to the 1999 Kargil skirmish, the 2002 terrorist attack on the Indian parliament and the 2008 Mumbai attacks.
          Mubarakmand said, “It was Pakistan’s nuclear capability only that deterred India from going for another war. It (nuclear capability) has brought peace to the region in a way. India’s conventional military capability is four time higher than that of Pakistan. But, their parity in terms of nuclear arsenal, has neutralized India’s superiority.”

  • Geiger Readings for May 15, 2020

    Geiger Readings for May 15, 2020

    Ambient office  = 81 nanosieverts per hour

    Ambient outside = 122 nanosieverts per hour

    Soil exposed to rain water = 123 nanosieverts per hour

    White Onion from Central Market = 101 nanosieverts per hour

    Tap water = 86 nanosieverts per hour

    Filtered water = 65 nanosieverts per hour

  • Nuclear Reactors 780 – The Euratom Supply Agency Is Working On Mitigating Major Risks To The Supply Of Uranium – Part 2 of 2 Parts

    Nuclear Reactors 780 – The Euratom Supply Agency Is Working On Mitigating Major Risks To The Supply Of Uranium – Part 2 of 2 Parts

    Part 2 of 2 Parts (Please read Part 1 first)
        The third critical risk covered in the new report is a permanent reduction of production and a withdrawal from uranium exploration. This mainly results from economic constraints. In the past few years, the uranium market has been volatile. Currently, the global supply of uranium is plentiful and the prices are low and stable. Unfortunately for future supply, this availability of cheap uranium can cause a reduction in production of the uranium mining industry in order to stabilize or increase prices by avoiding further excess production. Low prices can also hamper the desire of investors to invest in uranium exploration. Such exploration is needed to discover and dig new mines to replace mines which are being exhausted. This will be needed for future demand growth.
         The new report said, “When market conditions are unfavorable, the mining company may decide to reduce production, put a mine under care and maintenance or shut it down for good. … If the impact on market prices is not as expected, a permanent closure of the mine will follow a first reduction of production. The lack of investment in new mines and withdrawal from uranium exploration may have consequences on the market in the medium and long-term, leading to an imbalanced market between production and demand of uranium.”
         The report suggests that the two major measures that power utilities should take to mitigate supply chain risks consists of maintaining strategic uranium reserves and diversify supply options.
         With respect to transport, the report says that it would be helpful to simplify procedures and reduce administrative burdens in order to save time and resources. Developing a project for licensing the companies that transport nuclear materials that is common for the territory of all European Union members would reduce the administrative burden and lead to more cost-effective and less time-consuming shipments. The report says the in order to address the specific issue of a lack of transportation hubs open to nuclear shipments, alternative routes should be developed as well as the possible use of dedicated charter vessels.
        The report says, “It is also important to make different stakeholders aware of the excellent safety record of the transport of radioactive materials.”  The maintenance of “appropriate levels” of inventories by European Union utilities and producers would mitigate risks of nuclear fuel supply shortages in the short term. Long-term investments in new facilities are also needed.
         The Euratom Supply Agency is mandated under the Euroatom Treaty to ensure that all the users in the European Union receive a reliable and equitable supply of uranium ore and nuclear fuels. Members of the Working Group on Prices and Security of Supply are drawn from nuclear generators and fuel cycle companies of various European Union countries.
        Other countries share some of these same problems and are working on solutions. The U.S. government is currently involved in building up a strategic reserve of uranium that will be supplied by U.S. uranium producers who currently supply less uranium than foreign suppliers.

  • Geiger Readings for May 14, 2020

    Geiger Readings for May 14, 2020

    Ambient office  = 66 nanosieverts per hour

    Ambient outside = 110 nanosieverts per hour

    Soil exposed to rain water = 112 nanosieverts per hour

    Lemon from Central Market = 157 nanosieverts per hour

    Tap water = 63 nanosieverts per hour

    Filtered water = 48 nanosieverts per hour

  • Nuclear Reactors 779 – The Euratom Supply Agency Is Working On Mitigating Major Risks To The Supply Of Uranium – Part 1 of 2 Parts

    Nuclear Reactors 779 – The Euratom Supply Agency Is Working On Mitigating Major Risks To The Supply Of Uranium – Part 1 of 2 Parts

    Part 1 of 2 Parts
        Analysis of Nuclear Fuel Availability at EU Level from a Security of Supply Perspective is a report from the Euroatom Supply Agency Advisory Committee Working Group on Prices and Security of Supply. The report is dated March 2020 and was released by the agency on the  4th May. This report identifies possible threats and restrictions which could potentially impact the availability of nuclear fuel which could reduce the provision of electricity at affordable prices to all European Union consumer. A previous report on this subject was published in 2015.
        While some members of the European Union are shutting down all their nuclear power reactors, others are building new reactors so the question of the availability of uranium is a very important one for officials responsible for the European Union power supply.
        The working group methodically reviewed the risks from threats to the from supply and demand balance, commercial and technical causes, and political and regulatory causes. Each on of the risks was assessed according to its probability, the scale of its likely consequences and the duration of its impact on supply. The group was able to compile a ranked list of the ten most important risks to the security of supply.
         The report concludes that the fuel supply and inventories should continue to be sufficient to ensure stable operation of all nuclear power plants in the
    European Union. Unfortunately, the situation of some fuel markets has not improved since the 2015 report was published. The top three risks that were identified in the current report include a lack of transport hubs that are open to the shipment of nuclear materials; a lack of significant investments in conversion facility; and the permanent reduction of production of uranium as well as exploration for new sources of uranium. These three major risks are different from the top three risks mentioned in the 2015 report which included a lack of investment in the development of new mines, overdependence of a single source of uranium supply and a lack of synchronization and over-regulation in transport authorization.
        The 2020 report states that the transport sector is often overlooked by the end users. The sector is exposed to various challenges which could easily endanger the security of the supply. The main problem is a difficulty in finding transport companies and/or ports willing to receive nuclear material shipment which make it increasingly expensive and more complex.
        Installed conversion capacity for uranium hexafluoride (also known as UF6) has significantly exceed demand for years according to the new report. Together with the extensive use of secondary supplies this has resulted in depressed prices. This in turn has resulted in some conversion facilities to halt production. Other conversion facilities are producing uranium hexafluoride far below their nominal capacity. Investment in new capacity requires stable and sustainable prices because construction and licensing such conversion facilities can occupy ten years or more.
        The report notes, “If the supply is reduced and not replaced, this may lead not only to an imbalance in supply and demand in terms of volumes, but also to a reduction in the diversification of the supply sources.” 
    Please read Part 2 next.

  • Geiger Readings for May 13, 2020

    Geiger Readings for May 13, 2020

    Ambient office  = 70 nanosieverts per hour

    Ambient outside = 122 nanosieverts per hour

    Soil exposed to rain water = 120 nanosieverts per hour

    Lime from Central Market = 50 nanosieverts per hour

    Tap water = 80 nanosieverts per hour

    Filtered water = 61 nanosieverts per hour

  • Radioactive Waste 770 – Researchers At Texas A&M Working On A Simple Chemical Recycling Process For Spent Nuclear Fuel – Part 2 of 2 Parts

    Radioactive Waste 770 – Researchers At Texas A&M Working On A Simple Chemical Recycling Process For Spent Nuclear Fuel – Part 2 of 2 Parts

    Part 2 of 2 Parts (Please read Part 1 first)
        Processes have been developed which can separate uranium, plutonium and neptunium. The problem is that these processes are very complex. The separation of americium has proven to be especially difficult. Burns said that the United States Department of Energy requires any spent nuclear fuel recycling to be proliferation resistant. This means that plutonium which can be use to create nuclear weapons must never be separated for the other elements in spent nuclear fuel during the recycling process.
        The researchers at Texas A&M investigated nuclear chemistry to find out if there was a simple nuclear reaction that could separate all the desirable elements in spent nuclear fuel at one time. It is well known that at room temperature, uranium will spontaneously form crystals in strong nitric acid. Inside these crystals, a central uranium atom is incorporated between two oxygen atoms. The uranium atom shares six electrons with each oxygen atom. Burns said, “We immediately realized that this crystal structure could be a way to separate out plutonium, neptunium and americium since all of these heavy elements belong to the same family as uranium.”
        The researchers hypothesized that if plutonium, neptunium and americium formed a similar bonding structure with oxygen that was the same as uranium bonding, then in a strong solution of nitric acid at room temperature, these elements should integrate themselves into the crystal as it formed.
        In order to test their hypothesis, the researchers created a surrogate solution of uranium, plutonium, neptunium and americium in highly concentrated nitric acid at sixty to ninety degree Celsius to imitate dissolving a real spent nuclear fuel rod in strong acid. They discovered that when the solution reached room temperature, the uranium, plutonium, neptunium and americium did separate from the solution together and uniformly distributed themselves in the crystal as had been predicted confirming their hypothesis.
         Burns pointed out that this simple one-step process met the requirement that any recycling process be proliferation resistant. The plutonium was not isolated but incorporated into the uranium crystals along with the other radioactive isotopes. He said, “The idea is that the reprocessed fuel generated from our prescribed chemical reaction can be used in future generations of reactors, which would not only burn uranium like most present-day reactors but also other heavy elements such as neptunium, plutonium and americium. In addition to addressing the fuel recycling problem and reducing proliferation risk, our strategy will drastically reduce nuclear waste to just the fission products whose radioactivity is hundreds rather than hundreds of thousands of years.”
        The results of the research at Texas A&M are very important for the nuclear industry. One of the major problems with the use of nuclear fission to generate electricity is the creation of tons and tons of spent nuclear fuel that must be dealt with in a safe and secure manner. This simple crystallization process will take the industry much closer to a realistic, inexpensive, safe way to deal with spent nuclear fuel. Next, the crystals containing the radioactive elements must be either converted into some kind of nuclear fuel or disposed of permanently in geological repositories.